Skip navigation

Case studies

Microgeneration approved installer
Case studies

Barn installation

Fact file

Sector Domestic homes
Completed Aug 2007
Output
4kWp
Installation time
4 days
Roof type Metal seamed roof
Panel type
Sharp monocrystalline
Barn installation

This solar PV system was installed on the roof of a metal barn.

Objective

The objective was to make a smallholding in North Wales carbon neutral.

Funding

The installation has been funded by a grant of 50% from the Energy Saving Trust and the home owner's own funds.